State of the house

The house state today is:

  • [x] Paint
  • [x] Parquet
  • [x] Tiles
  • [x] Security
  • [ ] Doors (70%)
    • [x] Ordered entrance door
    • [ ] Install entrance door
    • [x] Ordered interior doors (5)
    • [ ] Order rest of the doors
    • [x] Install the 5 doors
    • [ ] Install the rest of the doors
    • [x] Ordered glass for the railings
    • [x] Install glass for railings
    • [x] Ordered replacement for broken window
    • [x] Install replacement broken window
  • [ ] Carpentry
    • [x] First flight of stairs
    • [ ] Second flight of stairs
    • [x] Black finishes walls
    • [x] Black finishes windows
    • [ ] Vinyl parquet basement
  • [ ] Plumbing (70%)
    • [x] Install plumbing
    • [x] Install floor heating
    • [x] Install the heat pump elements
    • [x] Connect the interior/exterior heatpump elements
    • [x] Perform final checkup of the heat pump
    • [x] Perform mise en route (aka start + warranty)
    • [ ] Integration with KNX
    • [x] Install bathtub
    • [x] Install sinks upstairs - need cleaning up a bit to look nice
    • [x] Install sink downstairs - need cleaning up a bit to look nice
    • [ ] Shower panels downstairs
    • [ ] Shower panel upstairs
  • [ ] Ventilation (70%)
    • [x] Install ventilation pipes
    • [x] Install ventilation machine Zehnder 350Q
    • [ ] Intake, exhaust filters
    • [ ] Optional increase the capacity of the ventilation system (PEB)
  • [ ] Electricity (50%)
    • [x] Cables are laid
    • [x] High power electrical panel connections
    • [x] KNX panel modules for lights installed
    • [ ] KNX panel modules for heating installed
    • [ ] KNX line couplers and interface installed
    • [x] KNX wall bus couplers (200800)
    • [ ] KNX switches (including frames)
    • [x] Test lights
    • [ ] KNX programmed
    • [ ] Lights - about 50% of them are done.
    • [x] Meter moved inside
      • [x] Application
      • [x] Quote
      • [x] Scheduled date
      • [x] Execution
  • [ ] IT
    • [ ] WiFi Installation
    • [ ] Cables from the panel to IT room
    • [ ] Second rack (50%)
      • [x] Buy
      • [ ] Install
    • [ ] Infra installation
    • [ ] Network config
    • [ ] Domain config
    • [ ] Website config
    • [ ] HA config
  • [ ] Final operations (50%)
    • [x] Clean the house
    • [x] Clean the outside
    • [ ] Pathway
    • [ ] Driveway
  • [ ] Finishes
    • [x] Install big mirror
    • [ ] Install the swivel cabinet
    • [ ] Soap holder ground floor
    • [ ] Soap holder first floor
    • [ ] Cabinet between the sinks first floor
    • [ ] Storage cabinet first floor