Today I have seen progress on the site for a while. The guys placed the frame and the seel for the base plate:

plate 1

And here's the second one:

plate 2

I've talked to the builders a bit. They're coming from Luxembourg and are nice to talk to. They told me they have a special concrete where they don't need water (yet). However, when the guys with the prefab cellar arrive, they will need it...

They also told me about the bubble sheets I need to put around the cellar:

  • the bubbles must face outside
  • the civil engineer should do it, not I.

Things are looking up-ish!