House log - 15/12/21

December 15th, 2021 - House(1 min)

Today, despite some unfinished bits in the house, we did the removal. The removal company was OK, but a bit negligent.

We had Nichita doing a sleepover so we can fix the house, which helps because of the home schooling and stuff.

State of the house

The house state today is:

  • Paint
  • Parquet
  • Tiles
  • Security
  • Doors (80%)
    • Ordered entrance door
    • Install entrance door
    • Ordered interior doors (5)
    • Install the 5 doors
    • Order rest of the doors
    • Install the rest of the doors
    • Ordered glass for the railings
    • Install glass for railings
    • Ordered replacement for broken window
    • Install replacement broken window
  • Plumbing (90%)
    • Install plumbing
    • Install floor heating
    • Install the heat pump elements
    • Connect the interior/exterior heat pump elements
    • Perform final checkup of the heat pump
    • Perform mise en route (aka start + warranty)
    • Integration with KNX
  • Ventilation (70%)
    • Install ventilation pipes
    • Install ventilation machine Zehnder 350Q
    • Intake, exhaust filters - partially done,
    • Start the ventilation
    • Optional increase the capacity of the ventilation system (PEB)
  • Electricity (50%)
    • Cables are laid
    • High power electrical panel connections
    • KNX panel modules for lights installed
    • KNX panel modules for heating installed
    • KNX line couplers and interface installed
    • KNX wall bus couplers (200800)
    • KNX programmed
      • Lights cellar
      • Lights ground floor
      • Lights first floor
      • Heating cellar
      • Heating ground floor
      • Heating first floor
    • Lights - All lights we bought are installed

HTH,